Koresha Konti YUBUNTU!

Isomero rya firime na videwo birashobora gukurikiranwa cyangwa gukururwa nabanyamuryango gusa

Komeza urebe kubuntu ➞

Bifata munsi noneho umunota 1 wo Kwiyandikisha noneho urashobora kwishimira Filime zitagira imipaka & TV.

00:00:00 / 01:0:00
Imiterere IrabonekaExtreme Engineering Gusikana Umutekano : 01/27/2025Reba HDKuramo HD
20 Reba
Extreme Engineering

Extreme Engineering - Season 2 Episode 5 Iceland Tunnels

20 Reba
Around 200 miles northeast of the capital, Reykjavik, engineers are hard at work drilling 72km of tunnels deep in the mountains. Three full-face boring machines have been specially shipped from the US to this remote site, 100 miles south of the Arctic Circle. The tunnel’s purpose is to guide water to the valley floor from reservoirs that are also currently under construction. The cascading water will drive six turbines, each with a rated output of 115 megawatts. With a total capacity of 690 megawatts, it will be the biggest hydropower plant in Europe.

Ubwoko:

Abakinnyi:

Abakozi:

Igihugu:

Sitidiyo:

Igihe: 60:42 iminota

Ubwiza: HD

Itariki Yambere Yindege: Apr 13, 2003

Itariki yanyuma yindege: Jul 09, 2011

Igice: 77 Igice

Igihe: 9 Igihe

IMDb: 4

Ijambo ryibanze:

Ishusho